Railway Construction Gantry Crane for Precast Concrete Bridge Girder Erection for sale
Autor | Nachricht | |
Angemeldet seit: 01.07.2021 Beiträge: 5802 |
Railway Construction Gantry Crane for Precast Concrete Introduction Port: Qingdao, China Production Capacity: 1000sets/ Year Payment Terms: L/C, T/T, Western Union, Paypal, Money Gram Certification: RoHS, CE, ISO9001 Condition: New Maximum Lifting Weight: on Maximum Lifting Height: on Request Operation Form: Pendent Button Control / Remote Control Type: Common Gantry Crane Railway Construction Gantry Crane for Precast Concrete parameter Basic Info. Model NO. TLG Main Girder Form Single Girder Product Name Double Girder Gantry Crane Power Source 220V/380V/415V or on Request Color Industrial Yellow/Red or on Request Girder Type Box Type / Truss Type Insulation F Moving Type Rail Mounted Power Supply Type Cable Reel Application Widely Applied for Indoor and Outdoor Workplaces Warranty 2 Years Aftersale Service Engineer Overseas Service Available Electric Parts Siemens Delixi Chnt Hoist Type Rope Hoist / Chain Hoist on Request Work Duty A3-A5 Lift Capacity on Request Motor Gear Motor Trademark Dongqi Transport Package Standard Package for Ocean Shipping or Railway Specification Materials: Q235B/Q345B Origin China HS Code 8426193000 Railway Construction Gantry Crane for Precast Concrete After sale Brief Introducion: Bridge girder gantry crane is a specially designed for bridge construction of a gantry crane.Truss girder gantry crane is mainly composed of main girder, leg, crown, etc, with pin shaft and high-strength bolt connections between components, easy to tear open outfit, transportation;Compared with the ordinary gantry crane, installation fast and convenient, economical and practical. Working way: Option 1: Two sets cranes work together to lift 1pcs concrete beam.(Each crane lift capacity is 450ton)Option 2: One set crane work alone to lift 1pcs concrete beam( The crane max lift capacity is 900 ton) It applies to offten using road and bridge construction unit. It main applies to move the concrete bridge girder, precast slab, precast slab from one place to another place.This type of gantry crane divides into two type ![]() Technical Parameters: 1.There is a lower speed for the running and lifting speed to keed the accuracy of the coonections between concrete beams. 2. There should be enough room inside the concrete beam lifting crane to meet the demands of the installations of the concrete beam and bridge construction devices. 3.It should be convenient for the transportation of assemble and disassemble on the principle of high strength and product quality. 4. When 2 sets cranes working together to lift 1pcs concrete beam, the two cranes should lifting and running at same time and disctance. Packaging & Shipping 1. Main girder, ground girder and support legs will be packed by bubble paper; 2. All the electrical parts will be packed by plywood box; 3. Rails will be naked within container. Railway Construction Gantry Crane for Precast Concrete Bridge Girder Erection for sale |
|
Angemeldet seit: 18.09.2021 Beiträge: 5701 |
It is a great website.. The Design looks very good.. Keep working like that!. website | |
Angemeldet seit: 26.10.2021 Beiträge: 116 |
The railway construction gantry crane for precast concrete bridge projects plays a pivotal role in modern infrastructure development. This specialized crane is designed to handle the massive and often unwieldy precast concrete segments with precision and efficiency, ensuring they are correctly positioned to form the bridge structure. Its advanced lifting capabilities and mobility on the construction site make it indispensable for assembling large bridge components, including those with intricate designs and heavy loads. The use of such a crane significantly enhances the speed and safety of the construction process, particularly when aligning the concrete joint sections, which are crucial for the structural integrity and longevity of the bridge. By facilitating the precise placement of these joints, the gantry crane helps ensure that each segment fits seamlessly, contributing to the overall stability and durability of the bridge. | |