| 
 christopher2021 
 
Angemeldet seit: 01.07.2021
  
Beiträge: 5802
 | 
We have completed 1 order for ***** to Pakistan. This is a 3 ton overhead crane with ABM and Siemens Motors. 
 
The overhead crane was installed at a motorcycle production facility at Bin Qasim, Karachi. 
 
The crane will service the plant as it works double shifts to supply 44,000 units. 
 
Double Girder Overhead Crane Parameters 
 
Rated capacity: 3t 
Span: 16.06m 
Lifting height:11m 
Power supply: 380V 50Hz 3P 
Pendant control and remote control 
ABM motor for hoist 
Siemens motor for crane travelling 
Note: 
 
Our offer includes supply of complete crane. 
Rails and bus bar system are not included, and can be provided upon client’s request. 
Installation service is not included and can be provided upon client’s request. 
3 ton Double Girders Gantry Crane Finished Installation for reference 
During the design and manufacturing process, we fully considered the local working environment and climatic conditions of Pakistan, ensuring that the crane can adapt to harsh environments such as high temperature and dustiness, and always maintain stable performance. At the same time, we use high-strength steel and advanced welding technology to ensure the structural strength and durability of the crane. 
 
The crane’s double-girder bridge structure ensures excellent stability and load-bearing capacity while working. Its maximum lifting capacity is 3 tons, which can easily handle the handling tasks of various heavy-duty components in the motorcycle manufacturing process. In addition, the crane is equipped with advanced control systems and safety devices, such as overload protection, limit switches, etc., ensuring safety and reliability during operation. 
 
In terms of installation, since the climate conditions and working environment in Karachi, Pakistan are different from where our manufacturing plant is located, some adaptations need to be made during the installation process. We dispatched a professional technical team to the site and worked closely with local engineers and technicians to complete the installation of the crane. During the installation process, the team also took into account local safety regulations and operating procedures to ensure compliance and safety throughout the installation process. 
 
3 ton Double Girders Gantry Crane Finished Installation for reference-wire rope hoist 
Due to the large size and weight of the crane, there may be some minor deviations or errors during installation. During the trial operation, we found that some movements of the crane were not smooth enough and there were some minor stucks or vibrations. In order to solve this problem, our technical team conducted a detailed inspection and analysis of the crane’s structure, found out the root cause of the problem, and made precise adjustments and optimizations to ensure the crane’s smooth and smooth operation. 
 
In addition, during the trial operation, we also noticed the impact of the local working environment and climatic conditions on the crane. For example, the high temperatures in Karachi, Pakistan, may have a certain impact on the crane’s lubrication system and cooling system. Therefore, our technical team conducted special inspections and adjustments on the crane’s lubrication and cooling system to ensure that it can operate normally in high-temperature environments. 
 
Finally, we also noted that local operators may not be familiar enough with crane operation and maintenance. In order to ensure the safe and stable operation of the crane, our technical team provides local operators with detailed operational training and maintenance guidance to help them better master the operation and maintenance skills of the crane. 
 
The actual application of the crane in the motorcycle manufacturing plant in Karachi, Pakistan is very ideal and has been highly praised and recognized by customers. This further proves the competitiveness of our product quality and technical strength in the international market. 
 
Technical Specifications 
Rated capacity	t	3 
Lifting height	m	11 
Span	m	16.06 
Speed	Trolley traveling speed	m/min	5.0~20 (Inverter control) 
Bridge traveling speed	10.0~40 (Inverter control) 
Main hook lifting speed	0.8/5.0 (Double speed) 
Working class	/	 FEM 2M 
Power supply	V/Hz	380/3/50 
Trolley traveling power	KW	2*0.25 
Bridge traveling power	2*0.75 
Hoisting power	0.45/3.2 
Total power	5.65 
Total Weight	t	7.1 
Max wheel load	KN	36.8 
Protection class	/	IP55 
Insulation grade	 	F 
Ambient temperature	/	-20℃ ~ +40℃ 
Electrics (contactors)	/	Schneider contactors 
Hook type	/	With spring loaded Safety Latch and should have 360° rotation. 
Steel Material	/	Q235B 
Color	/	Bright yellow 
Paint	/	Galvanized 
Anti-collision system	/	Included 
Phase protection relays	/	Included 
Limit switch	/	Included 
Voltage Low Protect device	/	Included 
Emergency stop action	/	Included 
Ground fault protection	/	Included 
Short-circuit protection	/	Included 
Over-heating protection	/	Included 
Power-off protection	/	Included 
Over-current protection	/	Included 
Overload protector	/	Included 
Top Quality Buffer	/	Included 
Cross Power	/	C Track Festoon Cables 
Country of origin	/	China 
Recommended Rail Specifications: 
Type	Top Width(mm)	Bottom Width(mm)	Height(mm)	Weight(kg/m) 
P24	51	92	107	24.95 
*****
 |